My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004462
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:04:49 PM
Creation date
3/6/2020 1:42:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004462
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRILLING LOG Wel! ID MW-1 Boring ID MW-1 <br /> Client! Shell Oil Products Company Location 341 East Main Street, Ripon, California <br /> Project No: 240-0324 Phase Taskll 1 Surface Elev. ft, Page 1 of 2 <br /> Q Lithologic E -C �, Well D Well <br /> il: <br /> E a s C Construction v Construction <br /> t Description F ° Graphics o Details <br /> T.O.C. Elev. NA <br /> 0 round Surface0 <br /> ---------------- <br /> Concrete. Grave! 0 0 0 <br /> SAND; (SP); brown; very loose; <br /> damp; 10% silt, 80% fine to medium <br /> sand, 10% gravel with pyrite flecks-, <br /> no plasticity; high estimated <br /> permeability. <br /> 100 <br /> 5 5 <br /> 67 <br /> SILT; (ML); brown; firm; dry to damp; <11.0 <br /> 10% clay, 80% silt, 10% fine sand <br /> 100 with pyrite flecks; no plasticity;low <br /> estimated permeability. <br /> Silty SAND: (SM); brown; damp; 20% <br /> silt, 80% fine to medium sand with <br /> 67 pyrite flecks; no plasticity; high <br /> estimated permeability. <br /> 10 67 10 <br /> 100 <br /> 67 <br /> San SILT (ML);grey to brown; <br /> firm; dry to damp; 10%clay, 70% <br /> silt, 20% fine sand with pyrite flecks; <br /> 67 no plasticity; low estimated <br /> 15 permeability. 15 <br /> 100 Silty SAND; (SM);grey to brown; <br /> very loose; damp; 20% silt, 8096 <br /> medium sand with pyrite flecks; no <br /> plasticity, high estimated <br /> 100 ermeability. <br /> Sandy SILT; (ML); grey to brown; <br /> firm; dry to damp; 10%clay, 70% <br /> silt, 20% fine sand with pyrite flecks; <br /> 100 no plasticity, low estimated <br /> ermeability. <br /> 20 20 <br /> Continued Next Pacie <br /> Driller Gregg Drilling _ Development Yield NA Bentonite Seal 10.5' to 11.5' <br /> Logged By Paul Waite Well Casing 2" Dia. 0' to 13.5' Sand Pack 11.5' to 34' <br /> Drilling Started 3/23/98 Casing Type Schedule 40 PVC Sand Pack Type #2/12 Monterey San <br /> Drilling Completed 3/23/98 Well Screen 2" Dia.13.5' to 33.5' Static Water Level 25.50 ft Depth <br /> Construction Completed 3/24/yti Screen Type Siotted 'cnedule 4U ryt. Date sl L.3I�i3 <br /> Development Completed NA Slot Size 0.010" Notes: South side of lot. <br /> Water Bearing Zones NA Drilling Mud NA <br /> Grout Type Portland Type 1/11 <br /> WELL 24324 4/28/98 <br /> Cambria Environmental Technology, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.