My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004463
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 4:44:40 PM
Creation date
3/6/2020 1:42:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004463
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM BRIA <br /> Sampling Suspension: Cambria requested permission to discontinue quarterly sampling at this <br /> site pending SJCEHD's review of the closure request. SJCEHD staff.approved of immediate <br /> suspension of monitoring and sampling activities at this site in an electronic mail correspondence <br /> elated June 21, 2005.. Monitoring and sampling activities for all wells at this site have been <br /> discontinued as of the end of the second quarter of 2005. <br /> HISTORICAL GROUNDWATER REMEDIATION <br /> Interim Groundwater Remediation: Blaine began weekly purging of onsite monitoring well <br /> MW-1 on November 10, 1998,and onsite extraction well EW-1 on March 11, 1999. This practice <br /> continued until the groundwater extraction(GWE)system was started during March 2000. <br /> Groundwater Remediation System Operation: Cambria installed a GWE system .at this site <br /> which began operation in March 2000 and was shut down in July 2001. Hydrocarbon and MTBE <br /> concentrations have been substantially reduced in groundwater beneath the site. The GWE <br /> system extracted groundwater from well EW-1 at approximately five gallons per minute. An <br /> estimate of contaminant mass removed by the GWE system is sunimanzed in the following table. <br /> MASS REMOVAL BY GROUNDWATER EXTRACTION <br /> Constituent Total Removed <br /> Total Hydrocarbons 1.8 pounds <br /> MTBE 15.2 pounds <br /> Water 2,295,500 gallons <br /> ANTICIPATED THIRD QUARTER 2005 ACTIVITIES <br /> No monitoring or sampling is planned for the third quarter 2005 and beyond. Cambria has <br /> submitted a case closure request and quarterly monitoring and sampling suspension has .been <br /> approved by SJCEHD staff. . <br /> 0324 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.