Laserfiche WebLink
MAY-08-2000 16 47 CAMBR I A 518 420 9170 P 02/24 <br /> C ,AMBRIA <br /> system will be shut down until a carbon changeout is performed Cambria has the <br /> capability of shutting the system down remotely on short notice using a remote <br /> monitonng system <br /> • First Month of Operation Cambna\mll collect full sets of samples as outlined above, and <br /> have the analyses performed on 1-week turnaround Cambria will report analytical <br /> results as soon as we receive them Otherwise,the system will be operated as oubined <br /> above <br /> • Subs2guent Operabon Cambria will collect full sets of samples as outlined above, and <br /> have the analyses performed on standard 2-week turnaround Cambria will report <br /> analytical results as soon as we receive them Otherwise, the system will be operated <br /> as outlined above <br /> o Star <br /> up Reporting Cambria will prepare a brief report on the system startup that will <br /> summarize the system flowrates and operational parameters, sampling, and analytical <br /> results <br /> • O&M Reporting Cambria will prepare a reports on a monthly basis that will summarize <br /> the system flowrates and operational parameters, sampling, and analytical results <br /> Please call me at(510)420-3316 if you have any questions <br /> iOwen Ratchye <br /> cc Ron Rowe, San Joaquin County Environmental Health Department <br /> Karen Petryna, Equwva Services <br /> From the desk of <br /> Owen C.Ratchye,PX <br /> Senior Project Engineer <br /> Cambria Environmental Technology,Inc <br /> 1144 65th Street,Suite C <br /> Oakland, CA 94608 <br /> (510)420-3316 <br /> . Fax (510)420-9170 <br /> ■ <br />