My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004501
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:46:41 PM
Creation date
3/6/2020 1:48:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004501
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY-08-2000 16 47 CAMBR I A 518 420 9170 P 02/24 <br /> C ,AMBRIA <br /> system will be shut down until a carbon changeout is performed Cambria has the <br /> capability of shutting the system down remotely on short notice using a remote <br /> monitonng system <br /> • First Month of Operation Cambna\mll collect full sets of samples as outlined above, and <br /> have the analyses performed on 1-week turnaround Cambria will report analytical <br /> results as soon as we receive them Otherwise,the system will be operated as oubined <br /> above <br /> • Subs2guent Operabon Cambria will collect full sets of samples as outlined above, and <br /> have the analyses performed on standard 2-week turnaround Cambria will report <br /> analytical results as soon as we receive them Otherwise, the system will be operated <br /> as outlined above <br /> o Star <br /> up Reporting Cambria will prepare a brief report on the system startup that will <br /> summarize the system flowrates and operational parameters, sampling, and analytical <br /> results <br /> • O&M Reporting Cambria will prepare a reports on a monthly basis that will summarize <br /> the system flowrates and operational parameters, sampling, and analytical results <br /> Please call me at(510)420-3316 if you have any questions <br /> iOwen Ratchye <br /> cc Ron Rowe, San Joaquin County Environmental Health Department <br /> Karen Petryna, Equwva Services <br /> From the desk of <br /> Owen C.Ratchye,PX <br /> Senior Project Engineer <br /> Cambria Environmental Technology,Inc <br /> 1144 65th Street,Suite C <br /> Oakland, CA 94608 <br /> (510)420-3316 <br /> . Fax (510)420-9170 <br /> ■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.