My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004503
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:51:58 PM
Creation date
3/6/2020 1:55:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004503
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Y <br /> CA [ B R I A <br /> GROUNDWATER REMEDIATION <br /> Interim Groundwater Remediation: Blaine began weekly purging of onsite monitoring well <br /> MW-1 on November 10, 1998 and onsite extraction well EW-1 on March 11, 1999. This practice <br /> continued until the groundwater extraction(GWE)system was started during March 2000. <br /> Groundwater Remediation System Operation: Cambria installed a GWE system at this site <br /> which began operation in March 2000 and was shut down in July 2001. Hydrocarbon and MTBE <br /> concentrations have been substantially reduced in wells at the site. The GWE system extracted <br /> groundwater from well EW-1 at approximately five gallons per minute. An estimate of <br /> contaminant mass removed by the GWE system is summarized in the following table. <br /> MASS REMOVAL BY GROUNDWATER EXTRACTION <br /> Constituent Total Removed <br /> Total Hydrocarbons 1.8 lbs <br /> MTBE 15.2 lbs <br /> ! Water 2,295,500 gals <br /> ANTICIPATED THIRD QUARTER 2003 ACTIVITIES <br /> Blaine will gauge and sample all wells and tabulate the data. Cambria will prepare a groundwater <br /> monitoring report. Groundwater samples will be collected monthly from well MW-6A and these <br /> data will be reported via facsimile as we receive them from the lab, <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Groundwater analytical data from all of the wells at this site continue to show a declining or <br /> stable trend. Sporadic low level detections of MTBE in well MW-6A prompted a monthly <br /> sampling schedule for this well beginning in September 2002. Monthly groundwater analytical <br /> data from samples collected on February 24, March 28, and April 8, 2003 are included in this <br /> monitoring report. MTBE has not been detected in MW-6A since November 2002. <br /> As requested, Cambria has been sending the monthly sampling results via facsimile to the City of <br /> Rinne (a A itc nttnrn iA a A thA Qan Tnnniiin Onnnty Fnvirnmmnntal TNanith niannrtmpnt <br /> 0324 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.