Laserfiche WebLink
C A M B R I A <br /> 01 FOURTH QUARTER 1999 ACTIVITIES <br /> Ground Water Monitoring Blaine gauged and sampled all wells and tabulated the data <br /> Cambria prepared a monitoring report <br /> Ground Water Remediation Blaine continued weekly purging and sampling of onsite <br /> monitoring well MW-1 and onsite extraction well EW-1 Cambria compiled a table of analytical <br /> data and the number of gallons removed <br /> Interim Ground Water Remediation Cambria designed and installed a ground water extraction <br /> and treatment system <br /> Well Installation Cambria installed four ground water monitoring wells onsite and two <br /> monitoring wells offsite during the fourth quarter 1999 <br /> CLOSING <br /> We appreciate the opportunity to work with you on this project Please call Owen Ratchye at <br /> (510)420-3316 if you have any questions or comments <br /> i� <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> tRED 660 <br /> Owen C Ratchye `S�gP S tF��c <br /> Project Engineer <br /> NO 8727 <br /> AAsaS LeMay,JG 9lFOF MW3 <br /> Senior Geologist <br /> Figure 1 -Ground Water Elevation Contour Map <br /> Table 1 -Ground Water Purging and Analytical Data <br /> 2 -Ground Water Analytical Data -Oxygenate Compounds <br /> Attachment A -Blaine Ground Water Monitoring Report and Field Notes <br /> cc Karen Petryna,Equiva Services LLC,P O Box 7869 Burbank, CA 91501-7869 <br /> 2AAD iam„c A,.arco, ?1xll1e(vu vur-va Road, vxcaulcarV, r�[n7 nIJ8U2L7 nn <br /> I JVJU <br /> Robert Ben Duck, 2412 Avenue 360, Kingsberg, CA 93631 <br /> Dale Ramey, City of Ripon, 259 North Wilma Avenue, Ripon, CA 9366 <br /> g\rip 3411gm13g99gm doc <br />