Laserfiche WebLink
Cambria Environmental Technology Pumping test analysis Date June 14,1999 Appendix A. Page 1 <br /> 1144 65th St Theis analysis method Project 341 main St , Ripon, CA <br /> Oakland CA Unconfined aquifer <br /> ph(510)420 0700 Evaluated by Barbara Jakub <br /> Pumping Test No 3 Test conducted on May 5, 1999 <br /> Pumping well EW-1, EW-2 <br /> Discharge 11 40 U S gal/mm <br /> 1/u <br /> 101 100 101 102 103 104 105 106 101 <br /> 102 <br /> 101 <br /> 0 <br /> 0 <br /> 100 0 <br /> 101 <br /> 102 <br /> 103 <br /> o EW-2 <br /> Transmisslvlty[ft2/min] 4 82 x 100 <br /> Hydraulic conductivity[ft/min] 5 34 x 10 <br /> Aquifer thickness[ft] 9 04 <br /> fife name e2t1559h hyt <br />