Laserfiche WebLink
Cambria Environmental Technology Pumping test analysis Date June 8, 1999 Attachment A, Page 11 <br /> 1144 65th St Theis analysis method <br /> Oakland CA Unconfined aquifer Project 341 Main St, Ripon,CA <br /> ph(510)420 0700 Evaluated by B Jakub <br /> Pumping Test No 3 Test conducted on May 5, 1999 <br /> MW 1, Test well EW-1 MW-1 <br /> Discharge 11 40 U S gal/min Distance from the pumping well 42 85 ft <br /> Static water level 27 76 ft below datum <br /> Pumping test duration Water level Drawdown Corrected <br /> drawdown <br /> [min] [ft] [ft] [ft] <br /> 451 54000 2792 016 016 <br /> 452 54200 2792 015 015 <br /> 453 54400 2792 015 015 <br />