Laserfiche WebLink
Cambria Environmental Technology Pumping test analysis Date June 8, 1999 Attachment A, Page 3 <br /> 1144 65th 5t Time Drawdown-method after Project 341 Main St, Ripon, CA <br /> Oakland GA COOPER &JACOB <br /> ph(510)420 0700 Unconfined aquifer Evaluated by B Jakub <br /> Pumping Test No 3 Test conducted on May 5, 1999 <br /> MW 1,Test well EW-1 MW-1 <br /> Discharge 11 40 U 5 gal/min Distance from the pumping well 42 85 ft <br /> Static water level 27 76 ft below datum <br /> Pumping test duration Water level Drawdown Corrected <br /> drawdown <br /> [min] [ft] [ft] [ft] <br /> 51 017 2776 000 000 <br /> 52 017 2776 000 000 <br /> 53 017 2776 000 000 <br /> 54 018 2776 000 000 <br /> 55 018 2776 000 000 <br /> 56 018 2776 000 000 <br /> 57 019 2776 000 000 <br /> 58 019 2776 000 000 <br /> 59 019 2776 000 000 <br /> 60 020 2776 000 000 <br /> 61 020 2776 000 000 <br /> 62 j 020 2776 000 000 <br /> 63 021 2776 000 000 <br /> 64 021 2776 000 000 <br /> 65 021 2776 000 000 <br /> 66 022 2776 000 000 <br /> 67 022 2776 000 000 <br /> 68 022 2776 000 000 <br /> 69 023 2776 000 000 <br /> 70 023 2776 000 000 <br /> 71 023 2776 000 000 <br /> 72 024 2776 000 000 <br /> 73 024 2776 000 000 <br /> 74 024 2776 000 000 <br /> 75 025 2776 000 000 <br /> 76 025 2776 000 000 <br /> 77 025 2776 000 000 <br /> 78 026 2776 000 000 <br /> 79 026 2776 000 000 <br /> 80 026 2776 000 000 <br /> 81 027 2776 000 000 <br /> 82 027 2776 000 -000 <br /> 83 027 2776 000 000 <br /> 84 028 2776 000 000 <br /> 85 028 2776 000 000 <br /> 86 028 2776 000 000 <br /> 87 029 2776 000 000 <br /> 88 029 2776 000 000 <br /> 89 029 2776 000 000 <br /> 90 030 2776 000 000 <br /> 91 030 2776 000 000 <br /> 92 030 2776 0 00 --6--00- <br /> 93 <br /> 0093 0 31 2776 000 000 <br /> 941 031 2776 000 000 <br /> 95 1 031 2776 000 000 <br /> 961 032 2776 000 000 <br /> 971 032 2776 000 000 <br /> 98 032 2776 000 000 <br /> 99 033 2776 000 000 <br /> 100 033 2776 000 000 <br />