Laserfiche WebLink
Cambria Environmental Technology Pumping test analysis Date June 8, 1999F= <br /> 999 Attachment A, Page 6 <br /> 1144 65th St Recovery method after Project 341 Main St,Ripon, CA <br /> Oakland CA THEIS &JACOB <br /> ph(510)420 0700 Unconfined aquifer Evaluated by B Jakub <br /> Pumping Test No 3 Test conducted on May 5, 1999 <br /> MW-1, EW-1 Pumping Well MW-1 <br /> Discharge 11 40 U S gal/min Distance from the pumping well 42 85 ft <br /> Static water level 27 76 ft below datum Pumping test duration 544 00 min <br /> Time from Water level Residual Corrected <br /> end of pumping drawdown drawdown <br /> [min] IN [ft] (ft] <br /> 201 4000 2783 007 -007 <br /> 202 4200 2783 007 007 <br /> 203 4400 2783 007 007 <br /> 204 4600 2783 007 007 <br /> 205 4800 2783 007 007 <br /> 206 5000 2782 006 006 <br /> 207 5200 2783 007 007 <br /> 208 5400 2783 007 007 <br /> 209 5600 2782 006 006 <br /> 210 5800 2783 007 007 <br /> 211 6000 2781 005 005 <br /> 212 6200 2782 006 006 <br /> 213 6400 2782 006 006 <br /> 214 6600 2782 006 006 <br /> 215 6800 2782 006 006 <br /> 216 70 00 2781 005 005 <br /> 217 7200 2781 005 005 <br /> 218 7400 2781 005 005 <br /> 219 7600 2781 005 005 <br /> 220 7800 2781 005 005 <br /> 221 8000 2781 005 005 <br />