Laserfiche WebLink
C A M B R I A Mr Ron Rowe <br /> October S, 1999 <br /> 1 ANTICIPATED THIRD QUARTER 1999 ACTIVITIES <br /> Ground Water Monitoring- Blaine will gauge and sample all wells and tabulate the data <br /> Cambria will prepare a monitoring report <br /> Ground Water Remeduawn Blaine will continue weekly purging of onsite ;monitoring well <br /> MW-1 and onsite extraction well EW-1 Cambria will compile a table of the number of gallons <br /> removed and analytical data <br /> Investigation Work Plan Cambria will prepare an investigation work plan for further vertical <br /> and lateral plum definition <br /> CLOSING <br /> We appreciate the opportunity to work with you on this project Please call Owen Ratchye at <br /> (S 10)420-3316 if you have any questions or comments <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Owen C Ratchye p <br /> GEO <br /> Project Engineer �.�5 Sp,S !Fe off, <br /> * NO 6717 <br /> � <br /> Ailsa S Le May,R G ��9rFOP CAF4Q�� <br /> 0 <br /> Senior Geologist <br /> Figure 1 - Ground Water Elevation Contour Map <br /> Table l -Ground Water Purging and Analytical Data <br /> 2-Ground Water Analytical Data- Oxygenate Compounds <br /> Attachment A -Blame Ground Water Monitoring Report and Field Notes <br /> cc Karen Petryna,Equtva Services LLC,P O Box 6249, Carson, California 90749 <br /> g 1np 3411gm12g99gm doc <br /> 2 <br />