My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004525
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0004525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:52:51 PM
Creation date
3/6/2020 2:53:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004525
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> Water Sampling <br /> Water samples, if they are collected from the bonng, are either collected using a driven Hydropunch D type <br /> Sampler or are collected from the open borehole using bailers The ground water Samples are decanted into <br /> the appropriate containers supplied by the analytic laboratory Samples are labeled, placed in protective foam <br /> sleeves, stored on crushed ice at or below 4',C, and transported under chain-of-custody to the laboratory <br /> Laboratory-supplied trip blanks accompany the samples and are analyzed to check for cross-contamination <br /> An equipment blank may be analyzed if non-dedicated sampling equipment is used <br /> Grouting <br /> If the borings are not completed as wells,the borings are filled to the ground surface with cement grout poured <br /> or pumped through a tremie pipe <br /> MONITORING WELL INSTALLATION, DEVELOPMENT AND SAMPLING <br /> Well Construction and Surveying <br /> Ground water monitoring wells are installed to monitor ground water quality and determine the ground water <br /> elevation, flow direction and gradient Well depths and screen lengths are based on ground water depth, <br /> occurrence of hydrocarbon% or other compounds in the borehole, stratigraphy and State and local regulatory <br /> guidelines Well screens typically extend 10 to 15 ft below and 5 ft above the static water level at the time <br /> of drilling However, the well screen will generally not extend into or through a clay layer that is at least three <br /> ft thick <br /> Well casing and screen are flush-threaded, Schedule 40 PVC Screen slot size vanes according to the <br /> sediments screened, but Slots are generally 0 010 or 0 020 inches wide A rinsed and graded sand occupies <br /> the annular space between the boring and the well screen to about one to two ft above the well screen A <br /> two ft thick hydrated bentonite seal separates the sand from the overlying sanitary surface seal composed of <br /> Portland type LH cement <br /> Well-heads are secured by locking well-caps inside traffic-rated vaults finished flush with the ground surface <br /> A stovepipe may be installed between the well-head and the vault cap for additional security <br /> The well top-of-casing elevation is surveyed with respect to mean sea level and the well is surveyed for <br /> horizontal location with respect to an onsite or nearby offsite landmark <br /> Well Development <br /> Wells are generally developed using a combination of ground water surging and extraction Surging agitates <br /> the ground water and dislodges fine sediments from the sand pack After about ten nunutes of surging,ground <br /> water is extracted from the well using bailing, pumping and/or reverse air-lifting through an eductor pipe to <br /> remove the sediments from the well Surging and extraction continue until at least ten well-casing volumes <br /> Of ground water are extracted and the sediment volume in the ground water is negligible This process usually <br /> occurs prior to in5tallmg the sanitary surface seal to ensure sand pack stabilization If development occurs <br /> after surface seal installation, then development occurs 24 to 72 hours after seal installation to ensure that the <br /> Portland cement has set up correctly <br /> �y <br /> Page 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.