My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012508
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2900 - Site Mitigation Program
>
PR0506186
>
ARCHIVED REPORTS_XR0012508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 3:26:52 PM
Creation date
3/6/2020 2:54:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012508
RECORD_ID
PR0506186
PE
2950
FACILITY_ID
FA0007258
FACILITY_NAME
RIPON SHELL
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meeting Minutes :/30/00 <br /> Page 2 of 7 <br /> because tine meeting ran longer than e\pected The following minutes summarize the <br /> .' information reviewed Actions that were requested or proposed are summarized at the <br /> bottom of each agenda item Copies of all meeting handouts and/or slides are also <br /> attached <br /> 1 Introduction <br /> After everyone introduced themselves, Marcus Pierce briefly explained the folloNN ing <br /> meeting objectives <br /> • Review the status of remedial activities conducted by Nestle USA and Shell <br /> • Discuss future remedial actions <br /> • Start coordinating future remedial actions by Nestle/Shell with the City of <br /> Ripon groundwater withdrawals Coordination of these activities is needed to <br /> optimize remediation of the TCE and MTBE plumes and protect the City's <br /> groundwater supplies from further impacts <br /> �y 2 Nestle Soil Cleanup Actions <br /> Jean Moran presented a summary of the extent of TCE contamination in the vadose zone <br /> and the cleanup actions performed This item is summarized below and in the attached <br /> slides <br /> • Investigation of the vadose zone began in 1987 and four soil vapor surveys were <br /> conducted between 1987 and 1995 to identify source areas and delineate the <br /> extent of impacted soils <br /> • TCE impacted soils were identified near the former decaffeination building, the <br /> former water treatment building, and well cluster M-8 <br /> • A total of 12 soil vapor extraction wells were installed in three phases since <br /> 1988 and 170 lbs of TCE have been removed from the vadose zone <br /> • Cleanup of the vadose zone is nearing completion as influent TCE <br /> concentrations have become asymptotic in all SVE circuits Confirmation <br /> sampling and preparation of the Closure Report are scheduled for this year <br />
The URL can be used to link to this page
Your browser does not support the video tag.