Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection,the type of <br /> analysis to be performed is determined. Loss prevention of volatile compounds is controlled and sample <br /> preservation for subsequent analysis is maintained. <br /> Prior to sampling,the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe. Product thickness,if present,is measured to the nearest 0.01 foot and is noted in the field notes. <br /> In addition,all depth to water level measurements are collected with a static water level indicator and are <br /> also recorded in the field notes,prior to purging and sampling any wells. <br /> After water levels are collected and prior to sampling, 3f purging is to occur, each well is purged a <br /> minimum of three well casing volumes of water using pre-cleaned pumps(stack,suction,Grundfos),or <br /> disposable bailers Temperature,pN and electrical conductivity are measured a minimum of three times <br /> during the purging. Purging continues until these parameters stabilize. <br /> Groundwater samples are collected using disposable bailers. The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to Include the job number, sample <br /> identification,collection date and time,analysis,preservation(if any),and the sample collector's initials <br /> The water samples are placed in a cooler, maintained at 40C for transport to the laboratory Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes the job number,type of preservation,if any,analysts requested, <br /> sample identification,date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> ter than <br /> A laboratory supplied trip blank accompanies larcihk yS analyzed for some ompling set. For r all of the samsets e compounds <br /> samples,5%tnp blanks are included Th p <br /> as the groundwater samples <br /> ed <br /> As requested by Chevron Products Company, WM purge water and decontamination McKtttn k Waste Managementrlocat located m <br /> during sampling activities is transported y <br /> MCK11trlck. California <br /> i <br /> N,1Cs13F6malfWM'ChrMr,S0P 02-03-03 <br />