Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection,the type of <br /> analysis to be performed is determined Loss prevention of volatile compounds is controlled and sample <br /> preservation for subsequent analysis is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present, is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition,all depth to water level measurements are collected with a static water level indicator and are <br /> also recorded in the field notes, prior to purging and sampling any wells <br /> After water levels are collected and prior to sampling, each well is purged a minimum of three well <br /> casing volumes of water using pre-cleaned pumps (stack, suction, Grundfos), or disposable bailers <br /> Temperature,pH and electrical conductivity are measured a minimum of three times during the purging <br /> Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available, the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality,assurance/quality control standards The samples are labeled to include the job number, sample <br /> identification,collection date and time,analysis,preservation (if any), and the sample collector's initials <br /> The water samples are placed in a cooler, maintained at 4oC for transport to the laboratory Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes thejob number,type of preservation,if any,analysis requested, <br /> sample identification, date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples,5%trip blanks are included The trip blank is analyzed for some oral] of the same compounds <br /> as the groundwater samples <br /> As requested by Chevron Products Company, the purge water and decontamination water generated <br /> during sampling activities is transported by 1WM to McKittrick Waste Management located in <br /> McKittrick, California <br /> N 1Cahforma\forms%chevrori SOP I I i l 02 <br />