Laserfiche WebLink
Chevron Groundwater Monitoring Report(2Q2002) Page 2 of 2 <br /> ust 12,2002 <br /> Facility 99-6259-2409 East Main Street,Stockton,CA Date Au g <br /> • <br /> DISCUSSION: <br /> This groundwater monitoring and sampling event was performed by Gettler-Ryan Inc on April 11,2002 <br /> Groundwater samples were collected from two wells MW-3 was not sampled due to insufficient water No <br /> concentrations of TPHg,benzene, or MtBE were detected above the laboratory reporting limit in groundwater <br /> samples collected from wells MW-1 and MW-2 Groundwater elevation across the site increased an average of <br /> approximately 1 02 feet this quarter Groundwater flow was to the southeast at 0 0008 ft/ft <br /> LIMITATIONS: <br /> The findings presented in this letter are based on data and interpretations provided by Gettler-Ryan, Inc Gettler- <br /> Ryan Inc's report is attached The data presented in this summary is accurate only to the degree implied by the <br /> sources and methods used No warranty,expressed or implied, is made by SECOR <br /> If you have any questions,please feel free to contact me at(916)861-0400,ext 230 <br /> Sincerely, <br /> SECOR International Inc <br /> A <br /> &Roptrefilo-Ao <br /> Project Manager <br /> ATTACHMENT: <br /> • Attachment A—May 20,2002 Groundwater Monitoring& Sampling Report by Gettler-Ryan Inc <br /> cc Bob Cochran,Chevron Products Company,P O Box 6004, San Ramon,CA 94583-0804 <br /> Marty Hartzell,RWQCB—CVR,3443 Routier Road, Suite A, Sacramento,CA 95827 <br /> Steven Clair,Clair&Bossi,2800 W March Lane, Suite 310,Stockton,CA 95827-3098 <br /> Sherman Hinaman,P O Box 365, Gridley, CA 95948 <br />