My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004235
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2409
>
3500 - Local Oversight Program
>
PR0505603
>
ARCHIVED REPORTS_XR0004235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 9:17:15 AM
Creation date
3/9/2020 8:36:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004235
RECORD_ID
PR0505603
PE
2950
FACILITY_ID
FA0006892
FACILITY_NAME
SHERMAN HINAMAN TRUST ET AL
STREET_NUMBER
2409
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15542001
CURRENT_STATUS
01
SITE_LOCATION
2409 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ' <br /> Date May 24,2001 SECOR <br /> International Incorporated <br /> CHEVRON GROUNDWATER MONITORING REPORT (2Q2001) <br /> Primary Agency Dot Lofstrom <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-6258 Address 2409 East Main Street,Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International,Inc —Roger Hoffmore <br /> Consultant Project No 077 43461 016 <br /> Assembly Bill 681 Status Property Owner Sherman Hinaman,Gridley,CA <br /> . WORK PERFORMED THIS QUARTER: Second Quarter—2001- <br /> 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter-2001: <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Follow up on site closure request submitted in April 2000 <br /> QUARTERLY RESULTS SUMMARY. <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Produc6ZFP)Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 48 5 to 49 feet <br /> • Groundwater Gradient Northeast 0 0001 ftlft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor com <br />
The URL can be used to link to this page
Your browser does not support the video tag.