My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004238
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2409
>
3500 - Local Oversight Program
>
PR0505603
>
ARCHIVED REPORTS_XR0004238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 9:26:39 AM
Creation date
3/9/2020 8:37:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004238
RECORD_ID
PR0505603
PE
2950
FACILITY_ID
FA0006892
FACILITY_NAME
SHERMAN HINAMAN TRUST ET AL
STREET_NUMBER
2409
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15542001
CURRENT_STATUS
01
SITE_LOCATION
2409 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 1 <br /> STANDARD OPERATING PROCEDURE- <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc. field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory. Prior to sample collection,the type <br /> of analysis to be performed is determined. Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained. <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe. Product thickness,if present, is measured to the nearest 0.01 foot and is noted in the field notes. <br /> In addition, static water level measurements are collected with the interface probe and are also recorded <br /> in the field notes. <br /> After water levels are collected and prior to sampling, each well is purged a minimum of three well <br /> casing volumes of water using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride <br /> bailers. Temperature,pH and electrical conductivity are measured a minimum of three times during the <br /> purging. Purging continues until these parameters stabilize. <br /> Groundwater samples are collected using Chevron-designated disposable bailers. The water samples are <br /> transferred from the bailer into appropriate containers. Pre-preserved containers, supplied by analytical <br /> laboratories, are used for all samples. Duplicate samples are collected for the laboratory to use in <br /> maintaining quality assurance/quality control standards. The samples are labeled to include the job <br /> number, sample identification, collection date and time, analysis,preservation (if any), and the sample <br /> collector's initials. The water samples are placed in a cooler, maintained at 40C for transport to the <br /> laboratory. Once collected in the field,all samples are maintained under chain of custody until delivered <br /> to the laboratory. <br /> The chain of custody document includes the job number,type of preservation,if any,analysis requested, <br /> sample identification,date and time collected,and the sample collector's name. The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel. <br /> A laboratory supplied trip blank accompanies each sampling set. For sampling sets greater than 20 <br /> samples,S%trip blanks are included. The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples. <br /> As requested by Chevron Products Company, the purge water and decontamination water generated <br /> during sampling activities is transported by IWM to McKittrick Waste Management located in <br /> McKittrick, California. <br /> N;1CWif6mia%fonns%cbevmn-S0P.1 QIW <br />
The URL can be used to link to this page
Your browser does not support the video tag.