My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 2 FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2900 - Site Mitigation Program
>
PR0506313
>
SITE INFORMATION AND CORRESPONDENCE_CASE 2 FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:12:49 AM
Creation date
3/9/2020 8:54:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 2 FILE 2
RECORD_ID
PR0506313
PE
2950
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State )"ter Resources Contro'Moard `' <br /> o <br /> A . <br /> Division of Financial Assistance <br /> 10011 Street•Sacramento,California 95814 <br /> Alan C.Lloyd,Ph.D. P.O.Box 944212•Sacramento,California•94244-2120 RECIL-A <br /> pe <br /> (916)341-5761•FAX(916)341-5806+ www.waterboards.ca.gov/cwphome/ustcf Arnold Schwarzenegger <br /> Agency Secretary �uv:i SEP - 7 2005 Governor <br /> SEP 6 <br /> ENVIRONMENT HEALTH <br /> SHELL OIL COMPANY PERMIT/SERVICES <br /> SHELL OIL PRODUCTS US -HSE/S&E <br /> DEBORAHPRYOR <br /> 20945 WILMINGTON AVE S <br /> CARSON, CA 90810 <br /> Dear Ms.Pryor: <br /> UNDERGROUND STORAGE TANK CLEANUP FUND(FUND),FUND MANAGER DECISION <br /> FOR ELIGIBILITY DETERMINATION: CLAIM NUMBER 018072; FOR SITE ADDRESS: 1071 <br /> NLAIN ST N,MANTECA <br /> This is in response to a Fund Manager Decision dated May 17,2005,which was submitted on your behalf <br /> by Melissa Munro of Delta Environmental Consultants,Inc. The letter requests that I reconsider the <br /> Fund's Staff Decision dated September 20, 2004. After reviewing the request and supporting documents, <br /> I have decided to find in your favor and overturn the Staff Decision. Your claim is accepted for <br /> placement on the Priority List in Priority Class"D". <br /> This completes the initial review. The next step in the claim review process is to conduct a compliance <br /> review. <br /> Compliance Review: Staff reviews,verifies, and processes claims based on the priority and rank within a <br /> priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid,a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation,or your claim application contains a material error,the claim will be rejected. In such <br /> vert,you:.•ill be issued a Notice of Intended Removal, from the Priority List, informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record keeping_ During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices); (2) copies of canceled checks used to pay for work shown on the <br /> invoices; (3)copies of technical documents(bids, narrative work description,reports), and;(4)evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time; however, they will definitely be <br /> required prior to reimbursement. <br /> California En vironmental Protection Agency <br /> QJ Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.