My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2 FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2900 - Site Mitigation Program
>
PR0506313
>
WORK PLANS_CASE 2 FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 10:45:17 AM
Creation date
3/9/2020 8:56:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2 FILE 2
RECORD_ID
PR0506313
PE
2950
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ron Rowe CAMBRIA <br /> August 14, 1997 <br /> Reporting: After the analytic results are received,we will prepare a subsurface investigation report that, at <br /> a minimum, will contain: <br /> • A summary of the site background and history; <br /> • Descriptions of the drilling and soil sampling methods; <br /> • Boring log and well construction diagrams; <br /> • Tabulated soil and ground water analytic results; <br /> • Analytic reports and chain-of-custody forms; <br /> • Soil and water disposal methods; and <br /> • A discussion of the hydrocarbon distribution. <br /> SCHEDULE <br /> Upon receiving written work plan approval from the.SJCPHS, Cambria will obtain county permits and <br /> schedule drilling activities. We will submit our investigation report about six weeks after completing the <br /> field work. <br /> We appreciate the opportunity to work with you on this project. Please call if you have any questions or <br /> comments. <br /> Sincerely, Macy. <br /> -:� <br /> Cambria Enviro ental Technology,Inc. <br /> No.5747 <br /> N. Scott acLeod,R.G. <br /> Principal 'eologist <br /> Attachment A- Standard Field Procedures <br /> cc: A. E. (Alex)Perez, Shell Oil Products Company,P.O. Box 4023,Concord,CA 94524 <br /> FAPROJECI SHELL\Mantl071Unvestigation Work Plan Addendurnmpd <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.