Laserfiche WebLink
885 Jarvis Drive <br /> Sequoia "Morgan All CA 95037 <br /> (408)776 9604 <br /> FAX(408)782 6308 <br /> Analytical wwwsequoialab5com <br /> Blaine Tech Services(Shell) Project Shell Sampled 4/11/00 <br /> 1680 Rogers Avenue Project Number 1071 North Main Street Received 4112/00 <br /> San Jose, CA 95112 Project Manager Nick Sudano Reported 412$100 13 53 <br /> Notes and Definitions <br /> i <br /> # Note <br /> A-01 MTBE WAS PREPARED ON 4/24/00 <br /> M-03 Sample was analyzed at a second dilution per clients request <br /> h <br /> P-01 Chromatogram Pattern Gasoline C6-C12 <br /> P-03 Chromatogram Pattern Unidentified Hydrocarbons C6-C12 <br /> Q-02 I he spike recovery for this QC sample is outside of established control limits due to sample matrix interference <br /> DE-I Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> yP Not Reported <br /> dr-, Sample results reported on a dry weight basis . <br /> ReLov Recovery <br /> RPD Relative Percent Difference <br /> Sequoia Analytical-Morgan Hill <br /> Page 15 of 15 <br /> • <br /> �r <br />