My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2900 - Site Mitigation Program
>
PR0517531
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 9:52:57 AM
Creation date
3/9/2020 9:27:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0517531
PE
2950
FACILITY_ID
FA0013493
FACILITY_NAME
CHEVRON SERVICE STATION #201761
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ Chevron Products Company F 3 <br /> Chevron Service Station#201761 3 South Main Street,Manteca,CA September 19,2001 <br /> • Slug Tests. Slug tests will be performed in each of the three newly installed <br /> monitoring wells to derive values for transmissivity(T) and hydraulic <br /> F <br /> conductivity(K). t <br /> E] <br /> • Report. A report will be prepared after completion of necessary field work. <br /> The report will include soil boring logs, soil and groundwater analytical results, <br /> chain-of-custody documentation, groundwater gradient map, and conclusions. <br /> Field and laboratory procedures are presented as Attachment A. <br /> 6 <br /> SCHEDULE <br /> SECOR is prepared to initiate field work within 4 weeks following approval of this <br /> work plan by the San Joaquin County Environmental Health Division and issuance of <br /> permits by the City of Manteca and San Joaquin County. A report documenting the <br /> findings of the well installation and possible CPT borings is anticipated to be submitted <br />` approximately 8 to 10 weeks after the completion of the field work and upon receipt of <br /> all analytical data. <br /> a <br /> If there are any questions regarding the contents of this work plan, please cal! Bill <br /> Brasher of SECOR at (916) 861-0400 extension 284 or Bob Cochran of Chevron at <br /> mi <br /> (925)-842-9655. <br /> Sincerely, ' <br /> SECOR International Incorporated <br /> e <br /> i� <br /> r <br /> Brian Silva William E. Brasher, P.E. <br /> Staff Scientist Project Manager <br /> Attachments: Figure 1 - Site Location Map <br /> Figure 2 - Site Map ! <br /> Attachment A - Field and Laboratory Procedures <br /> r <br /> ;i <br /> cc: Bob Cochran, Chevron Products Company, San Ramon, CA <br /> Marty Hartzell, RWQCB, Sacramento, CA <br /> I, <br /> El <br /> Iyl� <br /> F <br /> I <br /> Ip <br /> f� <br /> i <br /> it <br /> 1:IChevron12017611Reports1201761 Muni WP 2001.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.