Laserfiche WebLink
• RDM ENVIRONMENTAL SAMPLE INFORMATION SHEET <br /> Client: Huntbrook Holdings LLC Sample Data: 12/3/2013 <br /> Site: 3138 East Main Street Project Number: — <br /> Stockton, CA Well Designation: <br /> Signature: <br /> Well Box ConditionlTraffic <br /> Traffic Control Yes N Time: hours <br /> Standing water Ye No above or el casing <br /> • Top of well level No Remark: <br /> Well cap&locked No Remark: <br /> Height of Riser C/ 1() <br /> Well Box 12" 24" Type of well box /\.QVZ*C,#y QuiSn/l;rt/f <br /> Purging/Sampling Equipment <br /> • Purging - <br /> 2"Disposable Bailer Submersible Pump <br /> 2"PVC Bailer Dedicated Bailer <br /> 4"PVC Bailers Centrifugal Pump <br /> • Sam rig - <br /> Disposable Bailer Teflon Bailer Disposable Tubing <br /> Well Purging <br /> Well Diameter: 2" 4" 6" <br /> 6" <br /> • Purge Vol. Multiplier 0.16 0.65 1.47 <br /> --7 2.61 <br /> Initial Measurement Recharge Measurement Calculated Purge <br /> Time: 0011J) Time: \V Z-1 Actual Purge <br /> Depth of Well Lam',0 p Depth to Water <br /> 4l. <br /> Depth to Water L4 ,q <br /> G o <br /> • <br /> I YSLy t 6 2 . <br /> Sample <br /> Start Purge L Urate Sample Time <br /> Time Tem eratur E.C. P H ORP Turbidity Volume <br /> 0.1 60 <br /> > tIS .t 6L4 <br /> —S. s. <br /> Sample Appearance <br /> 0 "x(21./. Lock <br /> Equipment Replacement <br /> Lock ` Well Cap — Bolts — Box <br /> 40 Remarks: <br />