Laserfiche WebLink
Bioventing Technology Wer -age Page 3 of 5 <br /> bioventing are designated in the following table: <br /> Pretreatment Activities Included in Cost <br /> None <br /> Fixed Cost Items Included Variable Cost Items Included <br /> Air injection wells and blowers installation [Operating and maintenance labor <br /> Substrate injection system installation(a) Utilities <br /> Cometabolic substrate(a) <br /> Site supervision <br /> Monitoring point installation Site quality assurance and health and <br /> safety support <br /> [Sampling and analysis for process control <br /> Residuals Management Activities Included in Cost <br /> None <br /> Comments <br /> Indirect costs such as project management, design and engineering, vendor selection, <br /> home office support, permit preparation and fees, regulatory interaction, site <br /> characterization, treatability testing, performance bond, and contingencies are not <br /> included in the estimated cost range. <br /> Type Title <br /> Technical Application..Guide for Bioslurping, Vol I-_Summary of the Principles and <br /> Memorandum Practices of Bioslurping (Oct 1998) (18 pages) <br /> Technical Application Guide_for-Bioslurping, Vol 11 - Principles_and Practices of <br /> Memorandum Bioslurping (Oct 1998) (167 pages) <br /> Brochure Bioslurping - Low Volatility Fuels Recovery <br /> Presentation Bioventing.,- BITS Seminar Presentation_(Jun 1998) (93 pages) <br /> Program Bioventing Cost Estimator Program (Excel spreadsheet, must be downloaded <br /> before running) <br /> Report Natural Pressure-Driven Passive Bioventing_Addendum (June 2003) (74 <br /> pages) <br /> Passive Bioventing_in Stratified Soils and Sh_allow__Groundwater <br /> http://enviro.nfesc.navy.mil/erb/restoration/technologies/remed/bio/bio-06.asp 6/17/2004 <br />