My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 8:03:33 PM
Creation date
3/9/2020 9:53:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CreobgicaI nc&Hies Inc. Pa e 3 <br /> g <br /> Marci Property <br /> Project No.: 770.2 <br /> December 14,2001 <br /> f Proposed Bidding of Pro'eet <br /> To remain in compliance with the USTCFP, Geological Technics Inc. requested V&W <br /> Drilling to prepare for drilling and installing the 2 deep',monitoring well and the 2 water table j <br /> monitoring wells. We have found V&W to be very cost effective for three primary reasons: <br /> • reasonable charge rate J <br /> • fast drilling equipment <br /> • well trained crew <br /> These costs have been included in our budget spreadsheet prepared giving estimated costs <br /> for performing the work approved by SJC PHS/EHD. The budget spreadsheet is attached <br /> and shows itemized cost for the tasks proposed. In an attempt to make this Pre-Approval <br /> flow smoothly, we have used the same unit cons for this work that has previously been <br /> approved by the USTCFP for other projects. <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. We then pay these charges and assist the Marci's in filling out the USTCFP <br /> reimbursement claim. <br /> Tentative Schedule for Implementing Work <br /> Task Description Schedule <br /> • .Prepare USTCFP Cost Pre-Approval for work plan Dec 2001 <br /> • Receive approval of costs from USTCFP Feb 2002 <br /> • Drill and install monitoring wells Apr 2002 <br /> • Prepare a Site Characterization Report June 2002 <br /> • Perform Groundwater Monitoring May 2002 - Feb 2003 <br /> • Prepare monthly groundwater monitoring Mar 2002 - Feb 2003 <br /> Thank you for your attention to this project. Call me if you have questions or need <br /> clarification. My phone number is (209) 538.-6424. <br /> I <br /> Respectfully Sub tted, <br /> GeologicalTechnics Inc. <br /> I! Raynold I. Kablanow II, Ph.D. <br /> Vice President <br /> cc: John & Margaret Marci <br /> Sam Savig - San Joaquin County <br /> Marty Hartzell—CRWQCB-CVR <br />
The URL can be used to link to this page
Your browser does not support the video tag.