Laserfiche WebLink
i <br /> 2969 Loomis Road <br /> Page 2 of 2 <br /> 3. Complete the fieldwork by July 8, 2005. <br /> 4. Submit the report of findings to EHD within eight weeks of completing the fieldwork. <br /> This report must include boring logs and analytical-results for soil and groundwater <br /> samples. <br /> DATED May 2, 2005 BY &�_ L <br /> c: CVRWQCB—James L. L. Barton, PG <br /> Geological Technics Inc. —Raynold I. Kablanow II, Ph.D.,PG <br />