Laserfiche WebLink
w <br /> Cleo logkaI Tedmks Inc Page 8 <br /> Bioventing/B iosparging <br /> Pilot Test Work Plan <br /> "' Project No.770.2 <br /> June 9,2006 <br /> 4.0 <br /> sand pack by adding and hydrating bentonite chips. A surface seal will be achieved by <br /> pumping a neat cement grout (augmented with < 4% bentonite) through the hollow stem <br /> .� augers as they are withdrawn. The wells will be secured with locking watertight caps <br /> encased in flush mounted traffic rated well boxes. <br /> -r 4.2 Equipment <br /> The equipment to be utilized for the test includes: <br /> • A blower for injecting air into the well(s). <br /> • Hoses and/or PVC piping for connecting blower to the individual wells. <br /> • Magnehelic gauges for measuring well head pressure/vacuum. <br /> • Manual meters for measuring 02, CO2, and VOCs. <br /> • Manual meter for measuring air speed. <br /> r <br /> 4.3 Bioventing Test <br /> .. Note: GTI utilized a government publication for guidance in developing the following test <br /> procedures- "Procedures for Conducting Bioventing Pilot Tests and Long-Term <br /> Monitoring of Bioventing Systems", prepared for the Air Force Center for Environmental <br /> Excellence, Brooks Air Force Base, San Antonio, Texas, by Parsons, 1700 Broadway, Suite <br /> 900, Denver, Colorado, 80290, May 2004. The document summarizes lessons learned from <br /> 145 bioventing remediation projects conducted at 56 Air Force installations. <br /> On line at: <br /> http://clu-in.orgltechfocusldefault focuslsec/Bioventing%252FBiospargingleat/Guidance/ <br /> Baseline oxygen (02), carbon dioxide (CO2), and VOC concentrations in the test wells will <br /> be obtained prior to starting the test. (note: the CO2 will only be monitored if a cost effective d �� <br /> .. hand held monitor can be procured for the test) This will be accomplished by calculating the <br /> ambient air volume present in the well and then using a vacuum pump to purge three well 4�v0s <br /> _ volumes from the well. When this has been accomplished the vapor drawn from the well will <br /> be pumped in to a tedlar bag and then hand meters will be used to check the 02 M, CO2 M <br /> and VOCs (ppm) concentrations in the bag. <br /> The pilot test will start with air injection into the shallow well IW-l. This will test the sandy <br /> layer at 40 - 45 feet bgs and a fast pneumatic response is anticipated due to the layer's higher <br /> permeability. The above parameters in addition to injection airspeed and wellhead <br /> vacuum/pressure will be measured at one-hour intervals in all monitoring points (extraction <br /> wells). If no influence is detected, then the sampling interval will be extended as conditions <br /> warrant. <br /> ftw <br /> r <br />