My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:24:52 AM
Creation date
3/9/2020 9:59:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C eo C0gica t Technics wo <br /> L11017 1h Street <br /> Modesto,California 95354 <br /> r (209)5224119/Fax#522-4227 <br /> l� Additional Site Characterization Work Plan <br /> Cone Penetrometer Testing <br /> Marci's Property <br /> 2969 Loomis Road <br /> Stockton, California <br /> Project No. 770.2 <br /> March 3, 2005 <br /> 1.0 INTRODUCTION <br /> LV <br /> An underground storage tank containing diesel fuel was formerly located on the property <br /> r see Figures 1 & 2. A previous consultant, Wm. J. Hunter & Associates (WJH), installed four <br /> groundwater monitoring wells in an . effort to determine if diesel fuel had impacted <br /> groundwater. In 1992, diesel contamination was detected in groundwater at the site. The San <br /> Joaquin County Public Health Services/Environmental Health Divisions (SJC PHS/EHD) <br /> subsequently directed that an investigation of the diesel release be investigated. <br /> The work performed to date is summarized below*: <br /> • March 1987—Two 5,000 gallon diesel USTs removed. <br /> • March 1988 — UST excavation deepened to 29 feet below grade surface (bgs). <br /> Excavation was filled with clean backfill: <br /> • April 1992 - Three groundwater monitoring wells:installed (MW-1 through MW-3), <br /> ( Wm. J. Hunter&Associates. <br /> L • May 1996—A single.soil boring (LB-1)to 80 feet bgs installed,Lush Geosciences. <br /> • September 1997-Well MW-4 installation,Wm. J. Hunter&Associates. <br /> Lr August 2000 — Two shallow wells (MW-5 & MW-6) and one deep well (MW-105) <br /> installed, Geological Technics Inc. <br /> • May 2002 - Two shallow wells (MW-7 & MW-8) and two deep wells (MW-104 & <br /> Lr MW-106) installed, Geological Technics Inc. <br /> 9 1992 to 1998—intermittent monitoring/sampling of wells MW-1 through MW-4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.