My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:15:13 AM
Creation date
3/9/2020 10:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technics Inc. <br /> 1101 7`h Street <br /> Modesto,California 95354 <br /> f i (209)522-4119/Fax(209)522-4227 <br /> I <br /> Revised Work Plan for <br /> Additional Dual Phase Extraction <br /> Pilot Test <br /> Mard Property <br /> ` 2969 Loomis Road <br /> Stockton, California <br /> Project No. 770.2 <br /> January 23, 2009 <br /> { 1.0 INTRODUCTION <br /> An underground storage tank containing diesel fuel was formerly located on the property — <br /> see Figures 1 & 2: A previous consultant, Wm. J. Hunter&Associates (WJH), installed four <br /> groundwater monitoring wells in an effort to determine if diesel fuel had impacted <br /> groundwater. In 1992; diesel contamination was detected in groundwater at the site. The San <br /> r? Joaquin County Public Health Services/Environmental Health Division (SJC PHS/EHD) <br /> i.t subsequently directed that an investigation of the diesel release be initiated. <br /> ' The work performed to date is summarized below*: <br /> r • March 1987 —Two 5,000g <br /> ' allon diesel USTs removed. <br /> • March 1988 — UST excavation deepened to 29 feet below grade surface (bgs). <br /> Excavation was filled with clean backfill. <br /> r • April 1992 — Three groundwater monitoring wells installed (MW-1 through MW-3), <br /> Wm. J. Hunter&Associates. <br /> ' • May 1996—A single soil boring (LB-1) to 80 feet bgs installed, Lush Geosciences. <br /> • September 1997- Well MW-4 installation, Wm. J. Hunter& Associates. <br /> r • August 2000 — Two shallow wells (MW-5 & MW-6) and one deep well (MW-105) <br /> installed, Geological Technics Inc. (GTI) <br /> • May 2002 - Two shallow wells (MW-7 & MW-8) and two deep wells (MW-104 & <br /> MW-106) installed, GTI. <br /> II <br /> _ E <br />
The URL can be used to link to this page
Your browser does not support the video tag.