Laserfiche WebLink
GeofDgwadTec&v-s Me Page 5 <br /> Groundwater Monitonng Report <br /> Project No 770 2 <br /> r November 13,2001 <br /> Well MW-4 lies adjacent to the former UST field Figure 5- MW-4 TPH-D vs <br /> Groundwater Elevation suggests an inverse relationship between groundwater elevation and <br /> contaminant concentrations in well MW-4 It is noted that the groundwater elevation <br /> exceeded the screened interval of well MW-4 and dilution may be taking place <br /> ' Conversely, the water table lies within the screened interval of well MW-5 and this may <br /> represent a more accurate reflection of residual contamination leaching into groundwater <br /> GTI makes the following recommendations <br /> • Continue quarterly groundwater monitoring for determining direction and contaminant <br /> trends <br /> ' • Perform monthly groundwater level measurements for one year <br /> • Install two additional deep wells screened similar to MW-105 to evaluate possible <br /> differences in shallow versus deep plume movement The wells should be placed in the <br /> locations of wells MW-6 and the northeast corner of the shop building <br /> GTI submitted an October 25, 2001 "Additional Site Characterization, Soil Boring & <br /> Monitoring Well Installation" work plan to San Joaquin County PHS/EHD to complete the <br /> above recommendations and we are awaiting a response <br /> 3.0 LIMITATIONS <br /> ' This report was prepared in accordance with the accepted standards and practices of t <br /> 13 p p p he <br /> field of environmental geology, groundwater hydrology and good business practices It <br /> ' should be recognized that definition and evaluation of environmental conditions is a <br /> difficult and an inexact science Judgments leading to conclusions and recommendations <br /> ' are generally made with an incomplete knowledge of the site-specific conditions present <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> ' local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> ` I <br /> 1 <br />