Laserfiche WebLink
Geofo�xcrtl7ec ws Inc 3 <br /> Mare's Diesel <br /> Work Pian Addendum <br /> March 2,2000 <br /> 3 0 SCHEDULE & REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after cost pre- <br /> approval from the fund The information gathered during this phase of work will be <br /> presented in a report that will include a summary of the geology as well as the results of <br /> sample analyses Dr Ray Kablanow, a registered professional geologist, will supervise the <br /> ' project Copies of the report will be forwarded to both the appropriate County and State <br /> regulatory agencies (SJC PHS/EHD and CRWQCB) <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc in accordance with accepted <br /> 1 geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This work plan was prepared by <br /> GeofogwafTechnics Inc. <br /> � r <br /> Michael J Niemi <br /> Geologist o��Of�ssipn�rc� <br /> o <br /> R t KNBLAf`OW it �n <br /> NO 5234 � <br /> Raynold I Kablanow II, Ph D * �• �,(• o� <br /> California Registered Geologist#5234gpF CAt1F���`P <br /> ' California Certified Hydrogeologist#442 <br />