Laserfiche WebLink
i <br /> Ceo(v�uul'Z"echnres Inc Page 4 <br /> Add"ttonal Site Characterization Work Plan <br /> Marci's Property <br /> L March 21,2000 <br /> 1� <br /> 3.0 SCHEDULE & REPORTING <br /> ' Geological Technics Inc anticipates that all work will begin as soon as work plan approval <br /> and cost pre-approval have been received The information gathered during this phase of <br /> work will be presented in a report that will include a summary of the geology as well as the <br /> ' results of sample analyses Dr Ray Kablanow, a registered professional geologist, will <br /> supervise the project Copies of the report will be forwarded to both the appropriate County <br /> and State regulatory agencies (SJC PHS/EHD and CRWQCB) <br /> ' 4.0 SIGNATURE AND CERTIFICATION <br /> ' This project will be performed by Geological Technics Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> ' This work plan was prepared by <br /> GeologwafTecFinzcs Inc <br /> r � <br /> Michael J Niemi <br /> ' Geologist <br /> �Qapf�ss�o� <br /> R E KAR1I11d�h�f M <br /> VV � NO S� <br /> Raynold I Kablanow 11, Ph D � <br /> ' California Registered Geologist#5234 pF CA <br /> California Certified Hydrogeologist 4442 <br /> L - - -- <br />