Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> +Diesel, <br /> t............ <br /> .............................. ...... <br /> 9.71 L A <br /> -2 X-m <br /> ............... <br /> ............................. <br /> ........... <br /> SAIVIPLE:��Tl <br /> CA".9.4.36: <br /> �Stbc !m <br /> ........... <br /> XXX 1: 0'A" <br /> .............................. <br /> LIENY: HUNTER & ASSOCIATE DATE: 03/17/1993 <br /> PROJECT MANAGER:' BILL HUNTER SAMPLE LOCATION: MW-1 <br /> SAMPLER: DON LIGHT START TIME: 15:15 <br /> GROUNDWATER: XXX 11VADOSE: OTHER: <br /> CASING ELEVATION: (FEET MSL) CASING DIAMETER: 4 INCH <br /> DEPTH TO WATER: 71.91 FEET CALCULATED PURGE VOLUME: 10.93 GAL. <br /> DEPTH OF WELL: 88.65 FEET [ACTUAL VOLUME PER PURGE: 11,0 GAL. L <br /> lM <br /> MI< 0 <br /> IH <br /> ............. <br /> .............. <br /> ............ ...... ........ <br /> ............ <br /> qa <br /> V ..... <br /> ............... ......... <br /> i <br /> lidn. <br /> 15:25 0 7.6 929 22.8 CLEAR NO ODOR <br /> 7.4 978 21.3 <br /> 7.3. 1021 21.2 <br /> II 7.2 1067 22.0 <br /> 7.2 1088 21.2-1 <br /> PURGE METHOD 2" GRUNDFOS STAINLESS STEEL SUBMERSIBLE PUMP. <br /> SAMPLE METHOD: TEFLON BAILER <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: MW-2 71.50' MW-3 69.96' <br /> WEATHER: OVERCAST SKIES, <br /> QUALITY CONTROL:'! ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH A STEAM CLEANER. <br /> GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: AT THE NORTH END OF THE WASH AREA/ NORHT END OF BUILDING. <br />