Laserfiche WebLink
• I <br /> i <br /> WHF ENVIRONMENTAL CONSULTANTS, INC. <br /> 3 a Health & Safety Plan <br /> 1.o HEALTH AND ,SAFETY PLAN <br /> WIC' Environmental Consultants, Inc., has adopted the following health and safety <br /> procedures for working with organic vapors and liquidcontaminants encountered <br /> during drilling and excavation of subsurface soil. The purpose of this program is to <br /> provide health and safety precautions for the initial and ,subsequent site visits until the <br /> nature and magnitude of the°cazitaminants have been defined, <br /> �I <br /> 1.1 Personnel Responsibilities i <br /> :F <br /> All personnel assigned or involved with the remedial investigation or site clean <br /> ups will have an assigned responsibility. The outlined responsibilities will esta- <br /> blish standards for personnel protective wear, safety procedure's and provide for <br /> emergency actions which could arise during project operations.' <br /> 0 <br /> 1.2 Project Manager (PAD <br /> The Project Managerildirects all project operations. Project Manager (PM), in <br /> cooperation with theirproject Safety Officer (PSO), has the primary responsi- <br /> bility for ensuring that the safety plan is read, signed, and fully understood by <br /> all employees and outside persons allowed around or within designated working <br /> perimeters of the job site. <br /> In cooperation with the PSO, he is responsible, for ensuring that at all times <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> Plan. <br /> 1.3 Project Sctfety:Offcer(PSO) <br /> s <br /> J <br /> The PSO shall direct 'and_ensure that all employees comply with the Health and <br /> Safety Pian. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br /> :e <br /> �t <br /> • <br />