My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:15:11 PM
Creation date
3/9/2020 11:52:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• I <br /> i <br /> WHF ENVIRONMENTAL CONSULTANTS, INC. <br /> 3 a Health & Safety Plan <br /> 1.o HEALTH AND ,SAFETY PLAN <br /> WIC' Environmental Consultants, Inc., has adopted the following health and safety <br /> procedures for working with organic vapors and liquidcontaminants encountered <br /> during drilling and excavation of subsurface soil. The purpose of this program is to <br /> provide health and safety precautions for the initial and ,subsequent site visits until the <br /> nature and magnitude of the°cazitaminants have been defined, <br /> �I <br /> 1.1 Personnel Responsibilities i <br /> :F <br /> All personnel assigned or involved with the remedial investigation or site clean <br /> ups will have an assigned responsibility. The outlined responsibilities will esta- <br /> blish standards for personnel protective wear, safety procedure's and provide for <br /> emergency actions which could arise during project operations.' <br /> 0 <br /> 1.2 Project Manager (PAD <br /> The Project Managerildirects all project operations. Project Manager (PM), in <br /> cooperation with theirproject Safety Officer (PSO), has the primary responsi- <br /> bility for ensuring that the safety plan is read, signed, and fully understood by <br /> all employees and outside persons allowed around or within designated working <br /> perimeters of the job site. <br /> In cooperation with the PSO, he is responsible, for ensuring that at all times <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> Plan. <br /> 1.3 Project Sctfety:Offcer(PSO) <br /> s <br /> J <br /> The PSO shall direct 'and_ensure that all employees comply with the Health and <br /> Safety Pian. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br /> :e <br /> �t <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.