Laserfiche WebLink
d <br /> a <br /> LWHF Envimnmental Consu Rants, Inc. <br /> Health & Sq/ety Plan <br /> Page. 3 <br /> ' 1 <br /> 2..0 SAFETY IMPLEMENTATION <br /> The provisions of the WlIq Environmental Consultants Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background rev lew and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the'Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> associated with the on-site operation which exposure to, 'via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> L <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site�iayout has built-in safety features. The site is divided into <br /> L three zones. The following list defines the required personnel protective equipment. <br /> L <br /> I <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will file working in or around the exclusion zone of the job site <br /> L will use the following protective equipment and::measures as warrant by the <br /> Project Manager: <br /> L <br /> - Coveralls as an undergarment <br /> L - Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or`Neoprene outer gloves <br /> - Hard hat <br /> Steel toe boots ; <br /> - Robars or Tingley boots e <br /> L - Pull face-piece'respirator with R53HE cartridges (a combination of <br /> organic vapor, <br /> !acid gas, pesticide, radionuclide, high efficiency filter). <br /> L Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> Self-contained air will be utilized if project dictates <br /> L <br />