My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:15:11 PM
Creation date
3/9/2020 11:52:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> a <br /> LWHF Envimnmental Consu Rants, Inc. <br /> Health & Sq/ety Plan <br /> Page. 3 <br /> ' 1 <br /> 2..0 SAFETY IMPLEMENTATION <br /> The provisions of the WlIq Environmental Consultants Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background rev lew and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the'Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> associated with the on-site operation which exposure to, 'via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> L <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site�iayout has built-in safety features. The site is divided into <br /> L three zones. The following list defines the required personnel protective equipment. <br /> L <br /> I <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will file working in or around the exclusion zone of the job site <br /> L will use the following protective equipment and::measures as warrant by the <br /> Project Manager: <br /> L <br /> - Coveralls as an undergarment <br /> L - Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or`Neoprene outer gloves <br /> - Hard hat <br /> Steel toe boots ; <br /> - Robars or Tingley boots e <br /> L - Pull face-piece'respirator with R53HE cartridges (a combination of <br /> organic vapor, <br /> !acid gas, pesticide, radionuclide, high efficiency filter). <br /> L Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> Self-contained air will be utilized if project dictates <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.