Fuller Mobile Home Park
<br /> 365 E. Louise Ave.,Lathrop, California September 9, 1995
<br />' Quarterly Groundwater Sampling Report; July, 1995 Page: 2
<br /> 0
<br />' Summary of Analytical Findings
<br />' This quarter contaminants were detected in wells MW-1, 2, 3, and 5 Wells N1W-4, 6, and
<br /> 7 remained "ND", none detected, for all analytes Well MW-1 tested 180 ,uglL Benzene,
<br /> 6 7 ,ug/L Toluene, 860 pg/L E-Benzene, 760 pg/L Xylene, 8 7 mg/L Gasoline, and 17
<br /> mg/L Diesel Well MW-2 tested 20 pgfL Benzene, 70 pg/L E-Benzene, 100,ug/L Xylene,
<br />' 3 6 mg/L Gasoline, and 0 40 mg/L Diesel MW-3 tested 1,600 pg/L Benzene, 100 ,ug/L
<br /> E-Benzene, 250 ,ug/L Xylene, 3 7 mg/L Gasoline, and 15 mg/L Diesel Both MW-2 and
<br />' MW-3 tested "ND", none detected, for Toluene MW-5 tested 16 Pg/L Benzene, 3 2
<br /> ug/L Toluene, 0 50 ug/L E-Benzene, 2 7 Aig/L Xylene, 0 67 mg/L Gasoline, and 0 94
<br /> mg/L Diesel Last quarter's analytical data are shown in Table 2 for comparison
<br />' MW-1, 2, 3, and 5 continue to show BTEX, gasoline and diescl contaminants in the area
<br /> of the former underground tanks
<br />' The monitoring wells will be measured, purged and quarter,
<br /> ain sam led a next and a new
<br /> P g
<br /> gradient calculated
<br /> Prepared by
<br /> I
<br /> Qp,OFESsjOy_
<br /> c sem- NO
<br /> -
<br /> Lee DeLano, Pt W-223 3 9 22 339
<br /> California Registered Civil Engineer EXP e,-$aeq
<br /> `9 cinL
<br /> OFCAI.�F�' -
<br />■■ Robert W Chalmers
<br /> IWHF Staff Geologist, M S
<br /> I
<br />
|