Laserfiche WebLink
12/03/2003 14:25 2095224227 GEOLOGICAL TECHNICS PAGE 07 <br /> C,eological�eckaursl�u Page 3 <br /> Site Characterization Work Plan <br /> Cardoza(Louise) <br /> Project No..1135.2 <br /> December 2,.2003 <br /> i <br /> i <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after USTCI~P <br /> approval and upon issuance of the drilling permit. The informatioxl gathered during this <br /> phase of work will be presented m a report, which will include a summaxy of the geology as <br /> well as .the results of sample analyses. Based on this information, GTI will make <br /> recorx>nczendations for further additional investigation work if necessary, Dr,.Ray Kablanvw, <br /> a registered professional geologist, will supervise the project. Copies of the reports will be <br /> forwarded to both the appropriate County and State regulatory agencies (SIC PHS/EHD and <br /> CRWQCB). <br /> t <br /> 4.0 SIGNATURES & CERTIFICATION <br /> I <br /> Geological Tecl-mics Inc. will perforin this �rojeet in accordance with accepted geologic and f <br /> hydrologic standards of the State of Califonua accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for urxdisclosed conditions. j <br /> i <br /> This wo-rk plan was prepared by: <br /> i <br /> 'i <br /> ose D. gulo <br /> gist Q�oF�ssiOnia! <br /> w� c�C <br /> a.►.x `N <br /> rvo.5234 <br /> Raynold I. Kablanow II,Ph.D. 4&. d �� <br /> California Registered Geologist#5234 ��9�OF CAV%Foy\ <br /> Registered Environmental Assessor#901 <br /> - 1 ! <br /> i <br /> I <br />