My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004892
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
3500 - Local Oversight Program
>
PR0545438
>
ARCHIVED REPORTS_XR0004892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:52:25 PM
Creation date
3/9/2020 2:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004892
RECORD_ID
PR0545438
PE
3528
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
02
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compliance & Closure, Inc <br /> Soil Sampling Protocol <br /> Latest Revision March 1998 <br /> 8 ) When drilling through an aquifer known to be contaminated, a staged <br /> drilling approach will be used. This would involve using either <br /> a temporary or permanent conductor casing placed ad'acent to the <br /> contaminated aquifer and pressed or advanced slightly into the <br /> underlying aquatard. The cased hole will be cleaned as necessary, <br /> following which, a smaller diameter drill bit/auger will be <br /> advanced to the next underlying water bearing stratum An <br /> impermeable seal will be placed an the borehole <br /> or annular space as appropriate upon completion of exploratory <br /> boring/well construction <br /> II . SOIL SAMPLING BY HAND <br /> 1) Some situations require that samples be collected by hand without <br /> the assistance of a drill rig (e g , soil stock pales, excavation <br /> sidewall sampling, etc ) When possible, soil samples will be <br /> collected using a steel core sampler, equipped with clean brass <br /> liners, which as advanced into the soil with a slide hammer. In <br /> other cases, the outer surface of the soil as removed and a brass <br /> liner is driven into the soil by hand or with a hammer To avoid <br /> damaging the liner, a block of wood can be held next to the liner <br /> so that the hammer strikes the block rather than the liner The <br /> liner as removed and handled as described above In deep <br /> excavations where safety factors preclude the direct sampling of <br /> the bottom or side wall, soil is retrieved by a backhoe bucket and <br /> this soil is sampled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.