My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004892
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
3500 - Local Oversight Program
>
PR0545438
>
ARCHIVED REPORTS_XR0004892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:52:25 PM
Creation date
3/9/2020 2:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004892
RECORD_ID
PR0545438
PE
3528
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
02
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 10 '99 07 51AM LOS ALTOS HILLS P 1 <br /> 41 1 <br /> James W. Rasp P.E. <br /> 5134 E1rose Avenue <br /> San Jose,California 93124 <br /> Phone(408)448-6768 Fax(448)264 7264 Email JWRASPaaol cant <br /> May 08, 1999 <br /> Mr Gary Mulkey <br /> Compliance & Closure, Inc <br /> 7020 Koll Center Parkway, Suite 134 <br /> Pleasanton, CA 94566 <br /> Subject Survey of Monitoring Wells at Quik-Stop Market No 121 <br /> 1196 West Louise Ave , Manteca, California <br /> Your Job No 12118 <br /> Dear Mr Mulkey, <br /> • At your direction we surveyed elevations and locations of the 3 monitoring wells <br /> located at the Qulk-Stop Market No 121 in Manteca, California, on May 1. 1999 <br /> We used City of Manteca benchmark#25, a 2" brass disk in the northwest Curb <br /> return at the intersection of W Louise Ave and Union Rd with an elevation of <br /> 28 865 ft . as a basis for our elevation determinations The elevations of the 3 <br /> monitoring wells and the measured distance between the wells are listed below <br /> and are also shown on the attached sketch <br /> Ele_v_attions <br /> MW-1 30 26' Top of well cover <br /> 29 83' Top of PVC casing <br /> MW-2 -- 29 91'* Top of well cover <br /> 29 63' Top of PVC casing <br /> MW-3 29 29' Top of well cover <br /> 29 06' Top of PVC casing <br /> stan <br /> MW-1 to MW-2 60130` <br /> MW-2 to MW-3 55 85' <br /> • MW-3 to MWA 66 70' <br />
The URL can be used to link to this page
Your browser does not support the video tag.