Laserfiche WebLink
Compliance & Closure, Inc. <br /> Groundwater Sampling Protocol <br /> Latest Revision. March 1999 <br /> stratum, sample is withdrawn to the surface, and analyzed immediately <br /> thereafter. Probe holes are backfilled with a grout slurry or as the local <br /> permitting agency requires. The shallow survey contractor will supply <br /> sampling, purging, and field chemical analysis to CCI in their report. CCI <br /> considers this type of shallow probe mapping (together with shallow <br /> groundwater sampling) to be a reconnaissance technique only. <br />