Laserfiche WebLink
P.01 <br /> --`SEP=09-1996 10:46 MANTECA UNIFIED SD, <br /> KLEINEELOIER <br /> a <br /> i POSW Fax NOte 7871 �B � paq�esy <br /> Fe Fra4n �,....+ <br /> n <br /> ►CHMENT C <br /> r <br /> PtXM <br /> 3—�gC6 <br /> QST ESTIMATE <br /> F WUNDWATER ASSESSMENT <br /> ED SCHOOL DISTRICT <br /> FORMER UNDERGROUND STORAGE TANK <br /> 2901 LOUISE AVENUE <br /> MANTECA,CALIFORNIA <br /> PROJECT COST ESTIMATE <br /> The project will be billed on a time and materials basis according to K.leinfelder's Stockton 1998 <br /> Fee Schedule for Environmental Services. A breakdown of the project cost estimate for the <br /> proposed services is presented below. <br /> Task I Drilling Permit and Workplan Submittal <br /> Professional Services $ 389. <br /> Permit Fee*** 400• <br /> Task 1 Subtotal $ 789. <br /> •"This fee is for the perrnit only. The San Joaquin County Public Health Services Department/Environmental health Division <br /> (PHS/EHD)will bill oversight costs on a"time and materials"basis directly to Manteca U.S.D.. 'Me initial oversight Cee is <br /> S234. if more than 3 hours are required for FHS/EHD oversight,the additional time will be billed at S78/hour. <br /> Task 2 Temporary Monitoring Well Installation(Two Wells) <br /> Professional Services $ 900. <br /> Equipment and Materials $ 375. <br /> Drilling Subcontractor $1680 <br /> Task 2 Subtotal S 2,955. <br /> Task 3 Sample Collettion,Handling and Analysis <br /> Professional Services $ 80. <br /> LaboratoryAnal is: <br /> Analysis: <br /> 8 ea. TPH-D @$60. each $ 480. <br /> 8 ea. BTEX/TPH-G @$60. each $ 480. <br /> 8 ea. Oxygenates @$180. ea. $ 1,440. <br /> 8 ea.Methanol @$60. ea. $ 480. <br /> Task 3 Subtotal S 2,960, <br /> E <br /> t Task 4 Report Preparation <br /> Professional Services <br />'t Task 4 Subtotal 980. <br /> TOTAI.ESTIMATED COST S 7,684. <br /> 20-Yp8-161/2018PZ33/2018C484 pap t <br /> ®199I9.Kieinfelder.Inc. .August 20.1998 <br />` TOTAL P.01 <br /> I <br />