Laserfiche WebLink
i <br /> k'q KLEINFELDER <br /> undisturbed soil. The sampler is then removed from the bottom of the boring. The ends of the <br /> bottom (third) tube are covered with Teflon and sealed with tight fitting plastic caps- H <br /> Each sample is individually labeled. The label includes Kleinfelder's name,job number, the date <br /> and time the sample was collected, the employee number of the individual who performed the � <br /> sampling, and a unique five-digit sample identification number. <br /> B-2.4 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory. A Kleinfelder chain-of-custody form <br /> accompanies the cooler. The chain-of-custody form includes Kleinfelder's name, address and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, the sample matrix (soil or water) and the analyses for which the samples are <br /> i <br /> being submitted, if any. The chain-of-custody form is signed by each person who handles the <br /> samples, including all Kleinfelder employees and the receiving employee of office sample <br /> control or the analytical laboratory when the samples are delivered. <br /> B-2.5 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> trisodium phosphate or non-phosphate detergent wash,and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> B-2.5 Soil Boring Closure and Cutting Disposal <br /> i <br /> Soil borings are closed immediately after the collection and logging of soil samples. Closure is <br /> accomplished by grouting the boring with a cement/bentonite slurry or as otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the boring <br /> and left on site for disposal by the site owner. if requested, Kleinfelder can coordinate disposal <br /> of soil and water after analytical results are available. <br /> i <br /> I; <br /> 20-rra-161/201 Er 179 Page B-2 <br /> © 1998,Kleinfelder, Inc. June 22; 1998 <br /> . l <br />