Laserfiche WebLink
RESNA Industries Inc. <br /> Quality Assurance/Quality Control Plan <br /> rRevised November 1992 <br /> Provided the database is of sufficient size, statistical techniques may be employed for data <br /> validation. <br /> L9.0 GROUNDWATER MONITORING PROTOCOL <br /> Monitoring of depth to water and free product thickness within wells at the site will be <br /> conducted using an Interface Probe or Conductivity Meter. For consistency, all measurements <br /> will be taken from the north side of the wellhead at the survey mark. To assess potential <br /> infiltration of fine-grained sediments, total well depth will also be sounded. <br /> Product thickness is calculated by subtracting the depth to product from the depth to water. In <br /> addition, water elevations are adjusted for the presence of fuel with the following calculation: <br /> (Product Thickness) (.8) + (Water Elevation) = Corrected Water Elevation <br /> NOTE: The factor of 0.8 accounts for the density difference between water and petroleum <br /> C <br /> hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 hours after development prior to free <br /> product inspection. <br /> An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br /> I <br /> sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br /> sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br /> c <br /> QAQC1092.FNL 7 <br />