My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2901
>
3500 - Local Oversight Program
>
PR0545440
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 4:12:26 PM
Creation date
3/9/2020 2:30:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0545440
PE
3528
FACILITY_ID
FA0003845
FACILITY_NAME
MUSD-DISTRICT OFFICE
STREET_NUMBER
2901
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19811004
CURRENT_STATUS
02
SITE_LOCATION
2901 E LOUISE AVE
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Li Working To Restore Nature <br /> LThe monitoring wells will be constructed of 2-inch inside diameter PVC well screen/casing. <br /> The wells will be completed as shown on Plate 4 with a 0.020 inch well screen slot and #3 <br /> mesh sand pack. Neat cement will be used to seal the wells, in accordance with California <br /> Water Well Standards (December 1981). To protect the integrity of the wells, a locking, <br /> water-tight well plug will be installed on each well and a water-tight, locking wellbox labeled <br /> "monitoring well" will be concreted over each well. <br /> 4 After installation the wellheads will be surveyed vertically and horizontally to a common <br /> _ datum. Depth-to-water readings will be used to determine the groundwater flow direction <br /> Lbeneath the project site. <br /> 2.1.2 Groundwater Sampling and Analysis Methods <br /> Subsequent to installation the wells will be monitored for freeP roduct. The wells will then be <br /> developed in accordance with the QA/QC Plan (Appendix I). Water samples will be collected j <br /> after,purging a minimum of three well volumes (casing and sandpack). The water samples <br /> will be analyzed by Sequoia Analytical Laboratory for BTEX (EPA Method 8020) and TPHg <br /> Land TPHd (EPA Method 8015). <br /> LAll isite activities involving potential contact with hazardous materials associated with this <br /> investigation will be conducted in accordance with the site Health and Safety Plan (Appendix <br /> LI 2_2 Stockpiled Soil Remediation Assessment <br /> To Lcollect the necessary information to develop a remediation plan for the stockpiled <br /> excavation soil the following scope of work will be performed: <br /> LA minimum of eight soil samples (four sleeves each) will be collected from the stockpiled soil <br /> -pile. The samples will be submitted to Sequoia Analytical Laboratory in Redwood City <br /> (ELAP no. 1210) for compositing and analysis for BTEX, TPHg, and TPHd. by EPA methods <br /> 8020, and 5030/8015 respectively. The samples will also be analyzed for the inorganic <br /> compounds Phosphorus (P), Potassium OQ, Nitrogen N, and bacterial plate count. <br /> L <br /> 5 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.