Laserfiche WebLink
C A M B R I A <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> As noted above, soil borings were drilled at this site on October 16, 2002 Cambria will include <br /> conclusions and recommendations in the site investigation report <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (S 10)420-3336 <br /> Sincerely, <br /> Camb is Environmental Technology, Inc. <br /> Lisa Su rs <br /> Staff Scientist <br /> i ��o��QH w tiFOc <br /> J"Neely, f <br /> Senior Project Geologist <br /> a <br /> RG 6927 No 6927 a <br /> �P <br /> O�CALlFO� <br /> Attachments <br /> Figure 1 Site Vicinity Map <br /> Figure 2 Groundwater Contour/Cheirucal Concentration Map <br /> Appendix A Blaine Tech Services,Inc -Groundwater Monitoring Report <br /> cc Ms Karen Petryna, Shell <br /> Mr Marty Hartzell,Central Valley Regional Water Quality Control Board <br /> Mr Sirjit Sandhu(Station Dealer) <br /> 0832 2 <br />