Laserfiche WebLink
EQUI 7A WELL MONITORING .DATA. SHEET <br /> BTS #, 01 it IL-l- T 13 L Site -7110 Ln�. .I.t., <br /> Sampler: fan l� Date, It-1Li. u( <br /> Well I D : M 1✓-• l Nell Diameter: 2 3 ®- 6 8 <br /> Total Well Depth: 6 S'o Depth to Water: (, 3 <br /> Depth to Free P3oduct• Thickness of Free Product (feet): <br /> Referenced to• v crrde D 0. Meter (if req'd). YSI HACB <br /> Purge Method- Basler Waterra Sampling Method - as <br /> Disposable Bailer Peristaltic Disposable Bader <br /> Ivl�ddlebur Extraction Pump Ecttachan Part <br /> ectnc Sub - le Other Other Dedicated Tubing <br /> ��f �� <br /> ' PH MgillLtlT li�t1�'ICT �ltr1.n.nefnr 11�f ` <br /> 1" 0 04 V 065 <br /> �+ (Gals)x _ 1 --7 Gals 2" 0.16 6° 1 47 <br /> I Case Volume 5 eci€iied Volumes Calculated Volusna 3" 037 Othcr 0.163 <br /> Tame Te1Jzp °F) pH Co Turbidity Gals Removed Observahous <br /> [ 3 6 I-Lf -7. 7 -711 -76 4-1 <br /> 1.-7 1 0fv e- <br /> Did well dewater? yes 43q Gallons actually evacuated: 6 1 <br /> Sampling Time: LI o J+ Samp1mg Date: II- IWr n 1 <br /> Sample l.D.• M v- j Laboratory: Sequoia Other <br /> Analyzed for: -G BTEK MT TPH-D Other: Ox- j Gr) .6 F, Ka„ <br /> EB I D. f iapplicable): @{ nmL Duplicate I D (if apphcable)• <br /> 4IIalyZed for Tpx_G BTEX MTBE TFH-D cuter: <br /> �.0. (if req'd): Pre purge: Ing <br /> Post-pur�e- <br /> �.R P. cif req'd): pre-purge. ma Post`purge: mV <br /> -.� <br /> TECH SMVICES- <br /> BL41NE <br /> 1580 ROGE'n5 AVE -;++A!JOSE.?A 95112.ft05 14081 E75-0555 - FAX RUZI 573-7771 - CONTRACTOR'S LtCENSrz 8748684 <br />