Laserfiche WebLink
en viros® <br /> The sampling frequency for wells at this site changed from semi-annual to quarterly starting <br /> last quarter(the second quarter of 1997) <br /> Based on the absence of MTBE in Well MW-1 for the last two quarters, further site <br /> investigation with regard to MTBE is not warranted at this time Enviros is prepared to <br /> implement the work plan submitted in February 1996 once SJCEHD has completed <br /> reviewed and approval of the work plan <br /> If you have any questions regarding the contents of this document, please call <br /> Sincerely, <br /> Enviro Inc <br /> Thomas Magney QROF�SSlny� <br /> Project Geologist h�`��►� LU,V���yc <br /> LU <br /> j Diane M Lun quist, NO C46725 <br /> Senior Engineer f Cf VlL � <br /> �T of ca <br /> 016725 vi <br /> Attachments <br /> Table 1 Well Concentrations <br /> Plate 1 Vicinity Map <br /> Plate 2 Ground Water Contour/Benzene Concentration Map <br /> Appendix A <br /> Blaine Tech Services, Inc - Quarterly Ground Water Monitoring Report <br /> cc Ms Mary Meays, San Joaquin County Environmental Health Division <br /> Ms Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br /> J E McNellis, Property Owner <br /> 97377 2 <br />