Laserfiche WebLink
en viros, <br /> The sampling frequency for wells at this site changed from semi-annual to quarterly starting <br /> with this quarter(the second quarter of 1997) <br /> Based on the absence of MTBE in Well MW-1 this quarter,further site investigation vylth <br /> regard to MTBE is not warranted at this time Enviros is prepared to implement the work <br /> plan submitted in February 1996 once SJCEHD has completed reviewed and approval of <br /> the work plan <br /> If you have any questions regarding the contents of this document, please call <br /> Sincerely, <br /> Enviros, Inc <br /> Joe W Neely <br /> Project Geologist �o4�pFESS;py9� <br /> L U LU <br /> by Fr <br /> . x 4 <br /> Diane M Lundqui , P E �p c46725 <br /> Senior Engineer <br /> C46725 l'�Tf + <br /> OF�AUE���\� I <br /> Attachments <br /> I <br /> Table 1 Well Concentrations <br /> Plate 1 Vicinity Map <br /> Plate 2 Ground Water Contour/Benzene Concentration Map <br /> Appendix A <br /> Blaine Tech Services, Inc - Quarterly Ground Water Monitoring Report <br /> cc Ms Mary Meays, San Joaquin County Environmental Health Division <br /> Ms Elizabeth Thayer,Central Valley Regional Water Quality Control Board <br /> J E McNellis, Property Owner <br /> 97377 2 <br />