Laserfiche WebLink
MONITOR WELLS <br /> If bore holes are converted to monitor wells, 2" PVC C <br /> monitoring casing will be ' -installed with the lower, 151+ being <br /> slotted (slot size 0.02 inchesY. The annular space around the <br /> slots will be backfilled with clean course sand. A bentonite <br /> seal will be placed at the top of the screen area and the <br /> remaining annualar space will be cement filled. See typical <br /> monitor well detail attached. 4 <br /> SOIL SAMPLING i ANALYSIS <br /> ' k <br /> Soil samples will be sealed with aluminum foil, capped and <br /> refrigerated until delivered to the Eureka Laboratories, Inc. for <br /> analysis. If borings extend into the water table, then water <br /> samples will be taken after the wells are developed. <br /> • J <br /> FIELD ANALYSIS <br /> All soil samples will be field tested. <br /> If there are any questions or if additional information is <br /> needed, please do not hesitate to contact me. <br /> i <br /> mes Elder, P.E. M <br /> .B.M.E. Corp. <br /> 3814 Auburn Blvd. , Suite 62 <br /> Sacramento, CA 95821 } <br /> Attachments : <br /> 1. Laboratory analyses for soil samples . <br /> 2. Plate No. 1: Vicinity Map , <br /> 3. Plate No. 2 : Site Plan Map <br /> 4 . Plate No. 3: Tank Area/Monitoring Well Location <br /> 5. Plate No. 4 : Typical Monitor Well Construction <br /> 1 -4- <br />