My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAGNOLIA
>
510
>
3500 - Local Oversight Program
>
PR0545481
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 9:06:14 AM
Creation date
3/10/2020 8:36:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545481
PE
3528
FACILITY_ID
FA0004023
FACILITY_NAME
CA STATE UNIVERSITY STANISLAUS*
STREET_NUMBER
510
Direction
E
STREET_NAME
MAGNOLIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
510 E MAGNOLIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Bean <br /> Page 2 <br /> The last page of appendix B in the workplan is a letter from PHS/EHD to State of California <br /> dated June 12, 1991. The letter states that soil results from the recent tank removal exceed the <br /> maximum allowable limits of leaching potential as recommended by the LUFT Manual. This <br /> letter is referring to the slant borings which were drilled beneath Tank #3 on May 1, 1991. <br /> Product piping from Tank #3 was not investigated as part of the incomplete closure in place <br /> investigation which occurred May 1, 1991. j <br /> I <br /> PHS/EHD recommends that a new workplan be submitted to this department. The workplan <br /> should describe a method to determine the lateral and vertical extent of contamination around <br /> and beneath Tank #3. The workplan should also address the piping from Tank #3 to the boiler <br /> building. <br /> Please submit the workplan within.30 days of the date of this letter. I <br /> For further information please contact Steven Sasson at (209) 468-3459. <br /> i <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> `� I <br /> Yeve4 Sasso , error H-S Diane on, REHS <br /> Site Mitigation Unit Supervisor <br /> SS 3 <br /> i <br /> cc: Phil Skorge, Tetra Tech <br /> cc: Elizabeth Thayer, CVRWQCB <br /> cc: Barbara Anderson, SWRCB <br /> i <br /> i <br /> I <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.