My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004600
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
151
>
3500 - Local Oversight Program
>
PR0545482
>
ARCHIVED REPORTS_XR0004600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 11:53:03 AM
Creation date
3/10/2020 8:54:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004600
RECORD_ID
PR0545482
PE
3528
FACILITY_ID
FA0005075
FACILITY_NAME
DONS MOBILE GLASS
STREET_NUMBER
151
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
953365719
APN
21941015
CURRENT_STATUS
02
SITE_LOCATION
151 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrective Action Plan <br /> 2) Provide laboratory analysis of groundwater samples. Samples will be analyzed for TPHg <br /> and for BTEX as specified by the San Joaquin Environmental Health Services Division <br /> and the Central Valley Regional Water Quality Control Board(CVRWQCB) guidelines. <br /> Assume one trip blank will be analyzed each quarter. <br /> ' Task 8 Project Management and Reporting <br /> h <br /> k� <br /> 1) Reports start-up compliance monitoring and t=ytical <br /> onitoring provided under Tasks <br /> ' 3 through 5 and reports all other monitoring evaluation relevant to the <br /> remediation of the site; <br /> ' 2) Provide for analysis of the monitoring data and an on-going assessment of the cleanup <br /> progress; <br /> 3) Serve as all liaison with client and regulating agencies; and <br /> ' 4) Prepare periodic reports which summarizes progress and status of each aspect of the <br /> remediation process. <br /> Task 9 Final Effectiveness Evaluation and Site Closure Report <br /> 1 <br /> ' 701-1-2.cap OST Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.